Fine
We start the new section in the field. I turned the soil over by the tractor, yesterday. Now I need to make the land flat, because it tilts very much. Bringing the truck to the field and putting the soil on it and bringing it to sunk area and putting soil down there. One turn of this move takes half a hour. I repeated it more than 10times. Then it is finshed just before the dusk.
Tomorrow I like to work for coffee compost.
0 件のコメント:
コメントを投稿